Session 15: Passive Houses in Warm Climates
Saturday, 11th March 2023, Forum2
In Wiesbaden, will be recorded and provided on demand to the online participants after the conferencewill be recorded
English session
Time (CET) | Lecture | Speaker |
---|---|---|
2.30 pm | Welcome | Kate Nason | Passive House Australia |
2.35 pm |
Six Years of Monitoring of Split Units and Renewable Sources in EnerPHit Building Monitoring results of an EnerPHit building showed that split units can be used to cover sufficiently the heating and cooling demand. The electricity consumption of the whole building can be covered by a small PV system in the roof and solar thermal collectors are suggested for DHW preparation.
|
Georgios Dermentzis | Universität Innsbruck
|
2.50 pm |
160 Lucky Families: Flumen plus, Passivhaus plus Social Housing in Spain Flumen Plus is a multi-residential development of 160 social homes, that has recently been awarded the Passivhaus Plus Certificate. Thanks to industrialization and the optimization of resources, it has been possible to build a high-performance building for people with low economic resources. |
Guillem Boleda Arizcun | Grupo Lobe |
3.05 pm |
Three Storey Passive House in Lefkonas, Serres, Greece The 253sqm three storey house is built on a lage slope and it meets the needs of the five-member family who is living in. Its design follows the principles of Bioclimatic Principles and it was optimized to achieve maximum energy savings while all the criteria for a Passive House are met.
|
Leonidas Nassis | Leonidas Nassis |
3.20 Uhr | Questions and answers | |
3.40 pm |
The Path to one of the first Passivhaus in Argentina Building a Passivhaus in Argentina takes enthusiasm, skill and determination. This paper tells the story of how a visionary client and a competent local team managed to build a certify a first of a kind Passivhaus in Argentina. |
Pedro Reyna | Superficie |
3.55 pm |
Demonstrative Project of Step-by-Step Energy Retrofit of Social Housing in Hot Dry Climate A pilot project was completed in a hot dry climate of Mexico to energy retrofit social housing with no previous energy efficiency measures. Three bundles were installed to identify the technical and economic feasibility (subsidy + credit) of developing a social housing retrofit affordable solution. |
Salvador Rodriguez-Kuri | GOPA-Infra |
4.10 pm |
La Dianita Passivhaus The DIANITA is the first certified passive house in Argentina. Located in Mar del Plata, its climate is "WARM". I am very pleased to be able to present the development we are carrying out and to encourage our Latin American colleagues to continue developing the standard in our region. |
Paolo Massacesi | ILPAH |
4.25 pm | Questions and answers | |
|
To Session 14
|